Some Drywall Repairs Completed 08/12/19

[pics incl] All the drywall on the main floor has been completed and re-textured (painting to come later).

Most of the basement is complete (except one room). We decided to have them actually “knock-down” TEXTURE the walls in the basement (nothing in basement was even textured before and the rest of the house is “orange peel”)

Heather painted the basement closet.

We had them stop at the edge of the basement living room until we get caught up on flooring and the other rooms in the basement first.

This entry was posted in House. Bookmark the permalink.

Leave a Reply